53
Operations
Load Ribbon
9/6/07 XiIIIPlus/R110Xi/R170Xi User Guide 13383L-004 Rev. A
9. Bring the ribbon leader over the upper ribbon roller (1) and then toward the ribbon take-up
spindle (
2).
10. Wind the ribbon leader and attached ribbon counterclockwise around the ribbon take-up
spindle.
11. Rotate the spindle counterclockwise several turns to wind the ribbon and remove any
slack.
21