Allied Telesis X610-24TS Switch User Manual


 
22
SFP
2321
24
15 17 19 21R
16 18 20 22R 24R
23R
1000 / 100
SD
STATUS
FAULT
MASTER
RPS
PWR
PRES
MSTR
L/A
L/A
CLASS
1
LASER PRODUC
T
1
2
STACK
BUSY
READY
FAULT
CONSOLE
2082
x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
101
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up if installing in a top slot
and with the label facing down if installing in a bottom slot.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 70.
Figure 70. Installing a Transceiver
5.
Repeat this procedure to install additional SFP or SFP+ transceivers or
go to “Cabling the 10/100/1000Base-T and Fiber Optic Ports” on
page 102.
For SFP optical and cabling specifications, consult the documentation
shipped with the module.