Barco R90501005 Projector User Manual


 
F. Mounting optional Carry handle
A
A
A
B
B
C
Image F-2
Mounting the stacking points
Image F-3
Stacking points mounted
F.2 Preparing the new carry handle
What has to be done?
The back stacking point must be removed before the carry handle can be mounted on the CLM projector. The xation hole for the
xation bolt of the carry handle is covered by the stacking point construction.
How to remove the stacking point construction
1. Turn out the 4 bolts, 2 on each side. Be aware that there is a nut for each bolt on the inside of the carry handle. (image F-4)
210
R59770021 CLM R10+ 11/10/2010