Cisco Systems 78-16356-01 Computer Hardware User Manual


 
CHAPTER
3-1
Cisco Global Site Selector 4491 Hardware Installation Guide
78-16356-01
3
Installing the GSS
This chapter explains how to install a GSS in an equipment rack, or on a table or
workbench. This chapter also provides instructions for connecting cables, AC
power, and for booting the GSS.
Warning
Read the installation instructions before connecting the GSS to the
power source.
This chapter contains the following major sections:
Unpacking and Inspecting the GSS
Installing Your GSS
Connecting Cables
Connecting AC Power
Booting the GSS
Establishing a Serial Console Connection
Checking the Front Panel LEDs
Removing or Replacing a GSS
Before you begin the installation, be sure you have read:
Chapter 2, Preparing for Installation
Regulatory Compliance and Safety Information for the Cisco Global Site
Selector 4491