Compaq 3000 Computer Accessories User Manual


 
Chapter 3. Installation and Maintenance
EK–SMCPQ–UG. C01 3–23
13.
Connect the UPS serial control cable (17-04729-01) from the UPS connector
Controller Shelf host 0 I/O module to the like connector on the UPS.
14.
Install jumper connector 12-49700-01 to the Controller Shelf UPS connector
on the host 1 I/O module.
CAUTION
To prevent possible damage to the equipment, the
input voltage level of the UPS must be set to your
specific line voltage before proceeding. Refer to the
UPS manual and set the input level to your ac
power source(s).
15.
After the UPS has been set to the correct input voltage level, set the UPS
low-battery warning option to five minutes (refer to UPS manual for instruc-
tions).
16.
This completes the Controller and Device Expansion Shelf cabling proce-
dure. Dress and ty-wrap related cable groups, and then refer to the RAID Ar-
ray 3000 Getting Started and Command Console Installation and User
Guides for information describing how to setup and configure your subsys-
tem.