![](http://pdfasset.owneriq.net/6/8f/68f88077-3f67-4ccc-bcf4-54361995e934/68f88077-3f67-4ccc-bcf4-54361995e934-bgf.png)
2-7FPC 5000 Front Panel Controller • FPC Installation and Operation
3
Power ( / )switch — Toggle the power switch to the on ( ) position. After
approximately 2 minutes, observe that the LCD touch panel displays the FPC
start-up screen (figure 2-8). See chapter 3, Matrix 12800 Operation, for using
the FPC to operate the Matrix 12800 system.
Figure 2-8 — FPC 5000 Start-up screen