Extron electronic PVS 200 Switch User Manual


 
2-9
PoleVault Systems Installation • Installation — Stage 2
PVT transmitter installation
• CAT 5 T568A signal transmission cables (connects
PVT’s to PVS 204SA switcher)
MLC 104 IP Plus installation
• MLC power and RS-232 control cable (connects
the MLC to the MLC/Power control port on the
PVS 204SA switcher)
• IR/RS-232 communications cable control cable
(connects the MLC to the projector via RS-232
or to an IR emitter)
• LAN network cables (not supplied - connects
the MLC to LAN)
MLC, PW/RS-232/VC, 50
IR SERIAL COMM, 50’
CAT5 Patch, 50
Cables