GR2000 Installation Guide
1-2 GR2K-GA-1002
Rev. 6.03
1.2 Outline of Installation Process
Figure 1-1 outlines the installation process.
Figure 1-1 Outline of Installation
Installation planning.
• Determine target configuration and necessary components of the product
(Chapter 2 and Chapter 3).
• Ensure precautions in planning installation of the product (Chapter 4).
• Ensure requirements for the installation site (Chapter 5).
• Establish the installation plan.
Start
Hardware installation (initial).
• Unpack and install hardware components (Chapter 6).
• Connect cables, including customer-responsibility
interface cables (Chapter 6).
Hardware setup.
• Connect the console (customer responsibility; Chapters
4 and 6).
• Start up and set up the device for operation (Chapter 7).
Installation/deinstallation of
hardware options.
• Unpack hardware options
(Chapter 6).
• Add or remove hardware
options (Chapter 8).
Software update.
• Ensure that the device is
started up (Chapter 7).
• Update the software
components (Chapter 9).
End