Integra CROMA24 Printer User Manual


 
108 Assembly\Disassembly
Croma24 Service Manual
7. Insert the Strain Relief (with Trailing Cable) onto the Carrier
Assembly by sliding it onto the Strain Relief Support until it
snaps firmly into place. See Figure 5-4.
Replacing the Carrier Bushings
1. Perform the Carrier Assembly, Carrier Belt, and the Frame
Tensioner Removal procedures to remove the Carrier
Assembly from the Slide Shaft.
Figure 5-11. Carrier Bushing Removal.
2. Use a flat tip screwdriver to push up on the latch which holds
the Carrier Bushing in place. See Figure 5-11.
3. Pull the Carrier Bushing out of the Carrier Assembly.
4. Repeat Steps 2 and 3 for the other Carrier Bushing.