Juniper Networks J6350 Network Router User Manual


 
Chapter 6
Installing and Connecting a Services
Router
Make the appropriate preparations and verify the J-series equipment before installing
a J-series Services Router and connecting it to a power source and the network.
CAUTION: Do not install a combination of PIMs in a single chassis that exceeds the
maximum power and heat capacity of the chassis. If J-series power management is
enabled, PIMs that exceed the maximum power and heat capacity remain offline
when the chassis is powered on.
This chapter contains the following topics:
Before You Begin on page 117
Unpacking a J-series Services Router on page 118
Installing J2320 and J2350 Routers on page 119
Installing J4350 and J6350 Routers on page 120
Connecting Interface Cables to Services Routers on page 123
Chassis Grounding on page 123
Connecting Power on page 124
Powering a Services Router On and Off on page 129
Before You Begin
Before you begin installation, complete the following tasks:
Read the information in Maintenance and Operational Safety Guidelines and
Warnings on page 275, with particular attention to Chassis Lifting
Guidelines on page 266.
Determine where to install the Services Router, and verify that the rack or
installation site meets the requirements described in Preparing for Router
Installation on page 103.
For installation, gather the following equipment and tools:
For J2320 and J2350 Services RoutersNumber 2 Phillips screwdriver, and
mounting screws appropriate for your rack.
Before You Begin 117