Nortel Networks 553-3001-358 Server User Manual


 
46 Installation and configuration
553-3001-358/555-4001-135 Standard 02.00 July 2006
Unpack and inspect the equipment
Unpack and inspect the equipment for damage. Follow the steps in
Procedure 1, before performing the installation and configuration
procedures in this chapter.
Procedure 1
Prepare for the installation
1 Remove items from the installation site that can generate static charge.
2 Use antistatic spray if the site is carpeted.
3 Ground yourself before handling any equipment.
4 Remove equipment carefully from its packaging. Save the packaging, in case
the card has to be returned.
5 Inspect the equipment for faults or damage. Report any damaged component
to your Nortel Networks representative and the company who delivered the
This procedure is now complete
equipment.
Take inventory
After unpacking and inspecting the equipment, verify that all necessary
components are on site before beginning the installation. Check the
equipment received against the shipping documents. Report any
missing parts to your Nortel Networks representative.
Verify IPE Slot(s)
The ICB card can be installed in any IPE card slot associated with full
50-pin I/O cables. Tabl e 4 lists the Meridian system modules and the
card slots appropriate for ICB installation.
Determine the access method
Select the access method, single-number or direct meeting access, the
system will be using. With direct access, configure 10 DN pairs. In
Table 4
ICB installation into card slots
Meridian system modules ICB card slots
NT8D37BA/EC IPE modules, and
NT8D11BC/ED CE/PE modules.
All available IPE card slots.
NT8D37AA/DC IPE modules. IPE card slots 0, 4, 8, and 12.
CS 1000. 1, 2, or 3 of the Media Gateway, or slots
7, 8, 9, or 10 of the Media Gateway
Expansion.