Allied Telesis AT-8500 Series Switch User Manual


 
Chapter 2: Installation
54
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Make sure the following hardware components are included in your
switch package. If any item is missing or damaged, contact your Allied
Telesis sales representative for assistance.
One AT-8500 Series Fast Ethernet Switch
Two mounting brackets
Eight flathead Phillips screws (All models except the AT-8524POE
switch)
Twelve flathead Phillips screws (AT-8524POE switch only)
AC power cord (AC switches only; Americas, EC, Australia, and
UK only)
Management cable for local management
Documentation CD
Warranty card