Black Box TS1002A Barcode Reader User Manual


 
23
CHAPTER 2: Getting Started: Twisted Pair Networks
2. Getting Started: Twisted Pair
Networks
2.1 Charging OMNIScanner’s Battery
To operate the OMNIScanner and OMNIRemote with battery power, the battery
must first be charged. Until the charging cycle is complete, the units can run with
the AC adapter plugged in. (See Appendix B, Batteries for more information
about the batteries.)
2.2 OMNIScanner’s Project Screen
OMNIScanner’s project screen is designed to allow you to perform all typical work-
flow operations. The project, the test specifications, and the cable types are all
selectable from the OMNIScanner Project screen.
Press the ON/OFF key to power the unit on and display the project screen with
its three user-definable items: Project, Autotest, and Cable.
The first item Project name should be highlighted. Use the down-arrow to move
the highlight to the Autotest or Cable field. Press ENTER when a filed is
highlighted to change the current Project, Autotest, or Cable. OMNIScanner will
auto-sense the Adapter.
Battery and Memory status are graphically indicated by gauges with a display
ranging from empty (left-hand side) to full (right-hand side).
Press (Setup) to select Autotests configure Cables, and more.
Press (Measurements) to measure a cable’s performance, using a variety
of tests.