Dell 6024 F Switch User Manual


 
Configuring the Switch 65
PowerConnect 6024
Tapi Version: v1.1a1-P18
Core Version: v1.1a1-P18
18-May-2003 16:24:41 %INIT-I-InitCompleted: Initialization
task is completed
Start the sync process between devices 0 - 1
Sync OK
18-May-2003 16:24:41 %Box-W-PS-STAT-CHNG: PS# 1 status changed
- not operational
.
18-May-2003 16:24:41 %Box-I-PS-STAT-CHNG: PS# 2 status changed
- operational.
18-May-2003 16:24:41 %Box-W-FAN-STAT-CHNG: FAN# 1 status
changed - operational.
18-May-2003 16:24:41 %Box-I-FAN-STAT-CHNG: FAN# 2 status
changed - operational.
console> 18-May-2003 16:24:41 %DELL-I-STATUS: The product
global status has chan
ged from ok to non-critical at time 900.
18-May-2003 16:24:42 %LINK-W-Down: g1
18-May-2003 16:24:42 %LINK-W-Down: g2
After the switch boots successfully, a system prompt appears (
console>
) and you can use the
local terminal to begin configuring the switch. However, before configuring the switch, ensure that
the software version installed on the device is the latest version. If it is not the latest version,
download and install the latest version. See "Software Download and Reboot."