D-Link DES-3010FA/GA Switch User Manual


 
Mounting Device
Preparing for Installation
Page 23
Preparing for Installation
This section provides an explanation for preparing the installation site, and includes the following topics:
Installation Precautions
Site Requirements
Unpacking
Installation Precautions
Warnings
The surface on which the switch is placed should be adequately secured to prevent it from becoming
unstable and/or falling over.
Ensure the power source circuits are properly grounded.
Observe and follow service markings. Do not service any product except as explained in your system
documentation. Opening or removing covers marked with a triangular symbol with a lighting bolt may
cause electrical shock. These components are to be serviced by trained service technicians only.
Ensure the power cable, extension cable, and/or plug is not damaged.
Ensure the product is not exposed to water.
Ensure the device is not exposed to radiators and/or heat sources.
Do not push foreign objects into the device, as it may cause a fire or electric shock.
Use the device only with approved equipment.
Allow the product to cool before removing covers or touching internal equipment.
Ensure the switch does not overload the power circuits, wiring, and over-current protection. To deter-
mine the possibility of overloading the supply circuits, add together the ampere ratings of all devices
installed on the same circuit as the device being installed. Compare this total with the rating limit for
the circuit. The maximum ampere ratings are usually printed on the switch, near their AC power con-
nectors.
Cautions
Ensure the air flow around the front, sides, and back of the switch is not restricted.
Ensure the cooling vents are not blocked.
Do not install the switch in an environment where the operating ambient temperature might exceed
40ºC (104ºF).
Site Requirements
The device is placed on a table-top. Before installing the unit, verify that the location chosen for installation meets
the following site requirements.
General — Ensure that the power supply is correctly installed.
Power — The unit is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 100-250 VAC, 50-
60 Hz.
Clearance — There is adequate frontal clearance for operator access. Allow clearance for cabling, power
connections and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines and fluorescent lighting fixtures.