Orbit Manufacturing 2000 Printer User Manual


 
Page 4 - 2
Installation
© GBC Films Group January 2001
Orbit™ 2000 Operation and Maintenance Manual
4.1 Pre-installation checklist
The installation of the machine, the start-up of operation, and training must be provided by a qualified
GBC Films Group service technician, or another authorized organization.
Prior to the machine installation it is necessary to provide:
– an even floor of 2500 kg/ sq. meter minimal load factor ( 36.165 lb/ sq.ft ).
– a connection to air pressure of 0.6 Mpa @ 113L/ min. ( 90 PSI @ 4 CFM ) for the pneumatic
circuit.
– a fused dicconnect
– a connection of 3 phase with ground, 400/ 230VAC+/- 10 %, 50 Hz, 30 amps ( EU Version )
for the electrical circuit.
– a connection of 3 phase with ground 230VAC +/- 10 %, 60Hz, 30 amps ( US Version ) for
the electrical circuit.
Becker Compressor
The Becker compressor supplies air to the feeding assembly, and is connected by means of
a plug to the machine.
Machine position
The machine must be placed so that
– space of at least 40 cm (1.3 ft) is available between the stacking table and the wall or any
other fixed object
– space of at least 80 cm (2.6 ft) is available on the drive side between the covers and the wall
or any other fixed object (another machine, etc.)