Orbit Manufacturing 2000 Printer User Manual


 
Page 5 - 25
OperationsOrbit™ 2000 Operation and Maintenance Manual
© GBC Films Group January 2001
5/ Position the roll of film on the spool arbor ( c ) with respect to the adhesive side (Poly-in or Poly-
out). Refer to Section 6 Applications.
c
f
6/ Replace the control side conical cone ( f ) on the operator’s side and leave the 8 mm screw
loose for movemt.
7/ Measure from operators side/ side frame to paper pile left margin ( a ). Always add 1/8 in.
( 3.17 mm ) to this measurement. Use the measurement just obtained, with the 1/8 in ( 3.17 mm )
addition, to measure the edge of the film ( b ) on the spool arbor to the operators side/ side frame.
X + 10 mm
X + 3/8 in.
5 mm
X
a
b