xi
Figures
FIGURE 1-1 The Sun Fire V120 Server 1-2
FIGURE 1-2 Contents of the Ship Kit 1-4
FIGURE 1-3 The Front Panel of the Sun Fire V120 and Netra 120 Servers 1-6
FIGURE 1-4 The Back Panel of the Sun Fire V120 Server 1-7
FIGURE 1-5 The Back Panel of the Netra 120 Server 1-7
FIGURE 3-1 The Location of the Grounding Studs for Connecting the Two-Hole Lug 3-2
FIGURE 3-2 Stripping the Insulation From the Wire 3-4
FIGURE 3-3 Opening the DC Connector Cage Clamp (Lever Method) 3-5
FIGURE 3-4 Opening the DC Connector Cage Clamp (Screwdriver Method) 3-6
FIGURE 3-5 Assembling the DC Input Power Cable 3-6
FIGURE 3-6 Inserting the Bottom Portion of the Strain Relief Housing 3-7
FIGURE 3-7 Routing the Wires Out of the Strain Relief Housing 3-8
FIGURE 3-8 Securing the Wires to the Strain Relief Housing 3-8
FIGURE 3-9 Assembling the Strain Relief Housing 3-9
FIGURE 4-1 Inserting and Removing Hard Disks 4-3
FIGURE 4-2 Using the Antistatic Wrist Strap Supplied With the Server 4-4
FIGURE 4-3 Removing the Top Cover 4-5
FIGURE 4-4 Components of the Sun Fire V120 and Netra 120 Servers 4-6
FIGURE 4-5 Installing an Internal DVD or CD-ROM Drive 4-8