Sun Microsystems V120 Server User Manual


 
Contents v
6. Connecting the Cables 6-1
6.1 Connecting the Cables to the Server 6-2
6.2 Using a Single DC Power Cord 6-4
6.3 Setting Up Serial Connections 6-4
6.3.1 Connecting to a Terminal Server 6-5
6.3.2 Using a DB-25 Adapter for Your Serial Link 6-7
6.3.3 Using a DB-9 Adapter for Your Serial Link 6-8
6.3.4 Settings for the Serial Connections 6-9
6.4 Connecting to Your Server From a Laptop Running Microsoft Windows
6-10
6.4.1 Connecting the Sun Fire V120 or Netra 120 Server to the Laptop
6-10
6.4.2 Using Microsoft Windows HyperTerminal 6-11
7. Powering On the Sun Fire V120 or Netra 120 Server 7-1
7.1 Preparing to Configure the Server 7-2
7.1.1 Using a Terminal Server 7-2
7.1.2 Configuring From a Terminal or Workstation 7-2
7.2 Powering On the Server 7-3
7.2.1 Powering On for the First TimeWith the Server’s Details Registered
at a Name Server 7-3
7.2.2 Powering On the Server for the First Time Without Having Its
Details Registered 7-4
7.2.3 Powering On a Standalone Server for the First Time 7-5
7.2.4 Clearing Your Configuration and Starting Again 7-6
7.3 Using the Power (On/Standby) Switch 7-7
Part II Remote and Local Management
8. Managing the Server From the lom> Prompt 8-1
8.1 Introduction to Lights-Out Management 8-2
8.2 Powering On or Resetting the Server From the LOM Shell 8-3