Upgrading Job Scheduler
78 Adaptive Server Enterprise
Upgrading Job Scheduler
After upgrading to the new Adaptive Server, perform the following steps to
upgrade Job Scheduler.
Note You must have $SYBASE/$SYBASE_OCS/bin directory in $PATH so the
isql executable is accessible.
v Upgrading Job Scheduler
1 Copy the directory services entry for JSAGENT (or jsagent) from the old
server to the new server.
2 Make sure your new server is running.
3 Stop the Job Scheduler. From
isql, issue:
sybmgmtdb..sp_js_wakeup "stop_js", 1
go
4 Ensure that at least 9000 locks are configured. If the number of locks on
the server is less than 9000, use
sp_configure to increase the number of
locks:
sp_configure "number of locks", 9000
5 Upgrade the internal Job Scheduler SQL using isql:
use sybmgmtdb
go
dbcc upgrade_object
go
There is no need to specify any parameters.
6 Restart Adaptive Server.
7If the
sybmgmtdev device is less than 100MB, change the device to be a
minimum of 100MB. From
isql enter the following, where nn.nM is the
number of megabytes needed to get to 100 MB:
use master
go
disk resize name = 'sybmgmtdev' , size = 'nn.nM'
go
8 Optionally, add more log space. On some 64-bit platforms more space is
need for the
sybmgmtdb log. From isql enter:
use master