Intel SGI Altix 450 Switch User Manual


 
Safety Precautions
007-4857-002 3
If you have ordered either a single- or dual-IRU system that you intend to install on a table
top, follow the instructions in these sections:
“Safety Precautions” on page 3
“Unpacking and Inspecting Modules” on page 22
“Installing the IRUs in a Rack” on page 24
“Cabling the System IRUs to a Power Source” on page 31
“Connecting the System Console” on page 36
If you have your own rack, and have ordered system modules with the intention of
rackmounting and cabling your own system, follow the instructions in these sections:
“Safety Precautions” on page 3
“Unpacking and Inspecting Modules” on page 22
“Installing the IRUs in a Rack” on page 24
“NUMAlink Cabling the System IRUs” on page 29
“Cabling the System IRUs to a Power Source” on page 31
“Connecting the System Console” on page 36
Safety Precautions
Before you install an Altix 450 system, you should familiarize yourself with the safety precautions
discussed in the following subsections:
“Hazard Statements” on page 4
“ESD Precautions” on page 4
“Safety Measures” on page 5