22 007-4857-002
1: System Installation
Figure 1-9 Seismic Tie-down Attachment Points
Unpacking and Inspecting Modules
This section describes how to unpack and inspect individual IRUs. Follow these instructions if you
plan to install individual modules in a rack or on a table top.
Before unpacking your IRUs, inspect the packaging container for evidence of mishandling during
transit. If the packaging container is damaged, photograph it for reference. After you remove the
contents, keep the damaged container and the packing materials.
Remove the IRU(s) from the packaging container and ensure that all accessories are included.
Inspect the IRU(s) and accessories for damage. If the contents appear damaged, file a damage
claim with the carrier immediately. In addition, notify your local SGI Customer Support Center
(CSC) for any missing, incorrect, or damaged items. For CSC contact information, see
http://www.sgi.com/support/supportcenters.html.
Note: When using the IRU as a stand-alone unit (set on a desk or table top) you must secure the
IRU and its fan module together with connection plates. IRUs mounted in a rack are held in place
by the screws at the front and rear of the unit.
T
op view of short rack
Top view of tall rack
Seismic tie-down attachment poin
ts
Leveling pads
Casters