Juniper Networks J2320 Network Router User Manual


 
Chapter 6
Installing and Connecting a Services
Router
Make the appropriate preparations and verify the J-series equipment before installing
a J-series Services Router and connecting it to a power source and the network.
CAUTION: Do not install a combination of PIMs in a single chassis that exceeds the
maximum power and heat capacity of the chassis. If J-series power management is
enabled, PIMs that exceed the maximum power and heat capacity remain offline
when the chassis is powered on.
This chapter contains the following topics:
Before You Begin on page 115
Unpacking a J-series Services Router on page 116
Installing J2320 and J2350 Routers on page 117
Installing J4350 and J6350 Routers on page 118
Connecting Interface Cables to Services Routers on page 121
Chassis Grounding on page 121
Connecting Power on page 122
Powering a Services Router On and Off on page 127
Before You Begin
Before you begin installation, complete the following tasks:
Read the information in Maintenance and Operational Safety Guidelines and
Warnings on page 273, with particular attention to Chassis Lifting
Guidelines on page 263.
Determine where to install the Services Router, and verify that the rack or
installation site meets the requirements described in Preparing for Router
Installation on page 101.
For installation, gather the following equipment and tools:
Before You Begin 115