Matsushita CF-Y5LWVYZ 1 2 Laptop User Manual


 
51
(3)
(0.4)(0.4)
Reinforcement board side
Pad FFC is inserted
It sticks it
according to
U convex part
Insertion
after PAD is
pressurized
Pad WP Sheet affixation
Touch Pad affixation
Pad Cover A’ssy
Safety work
Safety work
The hole of a peel of yellowish brown of
PAD WP Sheet flaking off paper and a
transparent mount is inserted in the pin
of the treatment device and
<Touch Pad> affixes.
Installs in the receiving
stand of the pressurizing
treatment device.
<Preparation for PAD-2>
Insertion standard
Inside diameter
of grand foil
Sticking part
outside diameter
Safety work
The sticking part
externals are set
in a grand foil of PAD.
After affixes with the hand
temporarily, pressurizes with
the treatment device so as
not to generate the sticking
part of Pad Wp Sheet like
wrinkle etc.
Sticking part
externals
Pad Cover Externals
Pad Cover
affixation
Gasket (PAD)
affixation
Cutting side
Affixes in the concave part of a top case
Thing that pad Sheet’s corner does not hang on concave
happened the top part side
Suppress right above
Gasket (PAD) when you
install the Pad Cover
Touch Pad connec-
tion FFC is passed
through the hole.
Safety work
Safety work
The top part side
affixation in flaking
off paper of
transparency peel.
Peel off PAD and PAD WP Sheet and assemble again in the
procedure of the standard book when you remove PAD COVER
by the repair etc.
(For steady adhesive power of PAD COVER and PAD).