Matsushita CF-Y5LWVYZ 1 2 Laptop User Manual


 
75
0-0.5
0-0.5
Heat radiation grease(G-751)
Spreading
(Heat radiation plate for CPU)
6-8
9-11
3-5
13-15
Heat radiation grease(G-751)
Spreading
(Heat radiation board)
Grease spreading
on the other side
HDD Seat putting
HDD seat putting:
Flaking off paper
three places
Heat radiation plate installation for CPU
Heat radiation board
installation
Thing without concave part
range running aground of
top case,and thing without
waving
To the hole part of
a top case
To the range of the heat
radiation board of the
steps dropping part
Thing without concave part range
running aground of top case,and thing
without waving
The flaking off paper of a
two sided tape of the top
case preparation is put
and peel HDD seat is put.
Peel off slowly when you peel off
the flaking off paper.
(Transformation and measures)
Disk cover fixation
seat putting
Grease spreading on the
other side with treatment device
K/B Heat radiation seat putting
Thing without concave part range running
aground of concave part and disk angle
of top case, and thing without waving
Heat radiation grease spreading position
Heat radiation grease spreading position
Disk side cover fixation seat putting position
Cable confirms the slit part and
the going thing is confirmed
The externals overplus to
which Cable does not go
out of the Top Case side is
processed under Board
Processing of Antenna Cable
B
C
T
I
J
H
G
Draws under the side of Board
after tightening of the Screw and
pushes into the inside too much
Processing of Antenna Cable
The tightening order A T
The following are pretermission
Disk Angle
installation
The cable is along bossing
outer and processed.
Do not go out of the above
cabi side.
When there is BT
DXHM0056ZA
Cable is tightened and so as
not to bite, the putting out
Screw is tightened on the out-
side among Board and boss-
es
DXQT2+E6FNL
DXQT2+F3FNL
DXQT2+E10FNL
DRQT2+E8FKL
DXHM0056ZA
Engages with Board's con-
cave part Top Case Rib
A
D
Q
S
P
O
M
N
R
E
L
K
9.3.6.11. Top Case side screw tightening
9.3.6.12. Installation of K/B Heat Spreader