Initial steps using Device Manager
The initial commissioning steps involve basic setting configuration.
Prerequisites to initial steps
You must install the hardware.
You must install at least one cable to set up a remote connection to
the switch.
You must power up the switch.
Initial commissioning procedures
The following task flow shows the sequence of procedures you perform for
the initial commissioning steps. To link to a procedure, click the procedure
title in “Initial commissioning navigation” (page 34).
Nortel Ethernet Routing Switch 8600
Commissioning
NN46205-319 01.01 Standard