Initial steps using Device Manager
The initial commissioning steps involve basic setting configuration.
Prerequisites to initial steps
•
You must install the hardware.
• You must install at least one cable to set up a remote connection to
the switch.
• You must power up the switch.
Initial commissioning procedures
The following task flow shows the sequence of procedures you perform for
the initial commissioning steps. To link to a procedure, click the procedure
title in “Initial commissioning navigation” (page 34).