2-12 Installation
GigWorks MKII-16 Switch Model MKII-BASE16
59003-01 Rev. A Installer's/User's Manual
Operating the Switch
The Continuous Test button on the front of the Switch chassis and the switches on
the Chassis Switch Panel on the back of the Switch chassis are the only
operational controls. Place the Continuous Test button in the IN position for
normal operation. The Test mode switches must be set to 0 (POST). Refer to the
Chassis Switch Panel paragraphs in Section 1 of this manual. The default is 0.
The Switch becomes operational when:
• it is connected to an operational power source,
• the Power Button is in the ON (In) position,
• the Continuous Test button is in the OP (In) position,
• the Test Mode Switches are set to 0 (POST),
• and two or more Fibre Channel F or FL_Ports are cabled to their respective
operational N or NL_Ports respectively.
Installation