4.9 Switch membrane board 4 Replacement Procedures
Satellite A50S/TECRA A3X Maintenance Manual (960-534) [CONFIDENTIAL] 4-31
Installing the Switch membrane board
The following describes the procedure for installing the switch membrane board (See Figure
4-20).
1. Place the switch membrane board to the left side of the installation position and
slide it to the right to install. Then fix it with the following screw.
• M2.5x2.8B THIN BIND screw x1
2. Connect the switch membrane board cable to the connector CN3280 on the system
board.