3Com 5000 Switch User Manual


 
3
INSTALLING AND OPERATING THE
MODULE
This chapter describes the installation procedures for the 24-Port
module. Please read the precautionary procedures before unpacking the
module.
For your convenience, we have included a quick reference installation
card (17-00368). This card lists the DIP switch settings, 24-Port module
management commands, LED indicators and other module information.
Please store this card in the CoreBuilder 5000 hub reference binder in
the Reference Card area.
The remainder of this chapter describes:
Precautionary Procedures
Unpacking Procedures
Quick Installation
Module Overview
Setting the DIP Switches
Installing the Module
Configuring the Module
Showing Module Configurations
Gathering Statistics
Monitoring the Front Panel
LED and Network Verification
These topics are discussed in the following sections.