APC 15000 RAID Power Supply User Manual


 
Controller Installation
12 007-5510-002
2.2 Unpacking the System
Before you unpack your controller, inspect the shipping container(s) for damage. If you detect damage,
report it to your carrier immediately. Retain all boxes and packing materials in case you need to store or
ship the system in the future.
While removing the components from their boxes/containers, inspect the controller chassis and all
components for signs of damage. If you detect any problems, contact SGI immediately.
Your controller ships with the following:
controller chassis
two (2) power cords
RS-232 and Ethernet cables for monitoring and configuration
cover panel and rack-mounting hardware
2.2.1 Rack-Mounting the Controller Chassis
For instructions on mounting the controller in the rack, contact your service provider.
2.2.2 Connecting the Controller in Dual Mode
For dual mode configuration only:
1. Connect the LINK ports on the two controller units using the supplied cable.
2. Connect the COM ports on the two units using the supplied cable.
Wear an ESD wrist strap or otherwise ground yourself when handling controller
modules and components. Electrostatic discharge can damage the circuit boards.
!
Warning