5. Connections
The voltmeter (M) will immediately indicate the value of the mains voltage as soon as the projector is connected with the power
net.
1
2
M
S
H
P
Image 5-2
WARNING: Donot attemptoperation if the AC supply and cord are notwithin the specified voltage and power
range.
CAUTION: Once the projector is switched to standby, the lamp cooling fans will continue to run for approx-
imately five minutes to ensure that the projector and lamp have sufficiently cooled, at which point the fans
will automatically decrease to standby. To avoid therma
l stress that can lead to premature lamp failure, never
unplug the power cord while the lamp cooling fans are running. Never unplug the power cord to power down
the projector, first switch off the power switch and then unplug the power cord.
Fuses
The projector is protected with an automatic circuit breaker of 35 A which is built in into the power switch.
Volt meter
After starting up the projector (lamp ignition) check if the value indicated by the volt meter is still within the specified power range of
the projector. Note that in case the power net drops significantly during start up, the lamp will fail the ignite. If this is the case, take
the necessary measures to reinforce the power net to the projector before starting up the projector again.
Spare power plug
The projector isdelivered with a spare power plug. This sparepower plug isattached behind the nameplate of the projector. Remove
the cover of the lamp first to access this spare power plug, see "Removal of the lamp cover", page 195. Note that only qualified
technical personnel may install a new power plug.
43
21
N
L
PE
HAN Q4/2 +
Image 5-3
Pin configuration power plug HAN Q4/2 + PE.
36 R59770017 FLM HD14 15/03/2010