19-34
Cisco ONS 15454 SDH Procedure Guide, R7.2
October 2007
Chapter 19 DLPs D200 to D299
DLP- D235 Roll One Cross-Connect from an Optical Circuit to a Second Optical Circuit
Figure 19-8 Viewing the Rolls Tab
Step 12 If you selected Manual in Step 5, click the rolled facility on the Rolls tab and then click Complete. If
you selected Auto, continue with Step 13.
Step 13 For both Manual and Auto rolls, click Finish to complete the circuit roll process. The roll clears from
the Rolls tab and the rolled circuit now appears on the Circuits tab in the DISCOVERED status.
Step 14 Return to your originating procedure (NTP).
DLP-D235 Roll One Cross-Connect from an Optical Circuit to a Second Optical
Circuit
Step 1 From the View menu, choose Go To Network View.
Step 2 Click the Circuits tab.
Step 3 Press Ctrl and click the two circuits that you want to use in the roll process.
The circuits must have a DISCOVERED status; in addition, they must be the same size and direction for
you to start a roll. The planned Roll To circuit must not carry traffic. The Roll To facility should be DCC
connected to the source node of the Roll To circuit.
Step 4 From the Tools menu, choose Circuits > Roll Circuit.
Step 5 In the Roll Attributes area, complete the following (Figure 19-9):
a. From the Circuit Roll Mode drop-down list, choose Auto to create an automatic roll (required for a
1-way source roll) or Manual to create a manual roll (required for 1-way destination roll).
Purpose This task reroutes a cross-connect on one circuit onto another circuit,
resulting in a new destination.
Tools/Equipment None
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
DLP-D363 Provision Regenerator-Section DCC Terminations, page 20-68
for the ports involved in the roll
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher