Cisco Systems D200 Network Hardware User Manual


 
19-51
Cisco ONS 15454 SDH Procedure Guide, R7.2
October 2007
Chapter 19 DLPs D200 to D299
DLP- D246 Provision E-Series Ethernet Card Mode
Step 5 Click Go.
Caution Before continuing with the next step, verify that the database to upload is correct. You cannot reverse
the upload process after you click Yes.
Step 6 Review the information on the Confirm NE Re-Initialization dialog box, then click Yes to start the
reinitialization.
The reinitialization begins. After the software is downloaded and activated and the database is uploaded
to the TCC2/TCC2P cards, “Complete” appears in the status bar and the TCC2/TCC2P cards reboot.
Wait a few minutes for the reboot to complete.
Step 7 After the reboot is complete, log into the node using the “DLP-D60 Log into CTC” task on page 17-49.
Step 8 Complete the “NTP-D81 Change Node Management Information” procedure on page 11-2 and the
“NTP-D201 Change CTC Network Access” procedure on page 11-2 for information on provisioning the
node name, IP address, subnet mask and gateway, and IIOP port.
Step 9 Return to your originating procedure (NTP).
DLP-D246 Provision E-Series Ethernet Card Mode
Caution You cannot change the mode while the Ethernet card is carrying circuits. If you want change the card
mode, delete any circuits that it carries first. See the “NTP-D288 Modify and Delete Overhead Circuits
and Server Trails” procedure on page 7-4.
Step 1 In network view, double-click the node containing the E-Series Ethernet card that you want to provision,
then double-click the Ethernet card.
Step 2 Click the Provisioning > Card tabs.
Step 3 In the Card Mode area, choose one of the following:
For multicard EtherSwitch circuit groups, choose Multicard EtherSwitch Group.
For single-card EtherSwitch circuits, choose Single-card EtherSwitch.
For port-mapped circuits, choose Port-mapped.
Step 4 Click Apply.
Step 5 If you are using multicard EtherSwitch circuits, repeat Steps 2 through 4 for all other Ethernet cards in
the node that will carry the multicard EtherSwitch circuits.
Purpose This task provisions an E-Series Ethernet card for Multicard EtherSwitch
Group, Single-card EtherSwitch, or Port-mapped mode.
Tools/Equipment E-Series Ethernet cards must be installed.
Prerequisite Procedures DLP-D60 Log into CTC, page 17-49
Required/As Needed As needed
Onsite/Remote Onsite or remote
Security Level Provisioning or higher