Cisco Physical Access Gateway User Guide
OL-20932-02
Chapter 2 Installing and Configuring the Cisco Physical Access Gateway
Installing the Cisco Physical Access Gateway
Installing the Cisco Physical Access Gateway
• Before You Begin, page 2-7
• Procedure, page 2-7
Before You Begin
Before you install a Cisco Physical Access Gateway, verify the following:
• Verify that the module has access to a power source. See the “Power Options and Requirements”
section on page 1-12 for more information.
• Verify that you have the necessary mounting brackets or other hardware. See the “Mounting a
Gateway or Optional Module” section on page 1-14.
Procedure
To install the Cisco Physical Access Gateway, perform the following procedure:
Step 1 Mount the Gateway to a wall. See the “Mounting a Gateway or Optional Module” section on page 1-14
for more information.
Step 2 Connect the Gateway to a power source.
• If using a DC power source, insert a two-pin connector plug into the DC power port (Figure 2-4),
and connect the Voltage In (VIN) and ground (GND) wires.
• If using PoE, connect an Ethernet cable from the IP network to the ETH0 port (Figure 2-4).
See the “Power Options and Requirements” section on page 1-12 for more information.