Fujitsu N800 Server User Manual


 
22 U41243-J-Z156-1-76
Mounting the server in the rack Installing the server
Ê Pull the left mounted telescopic rail out as far as it will go and then mount it
to the appropriate carrier with the screws.
Ê Repeat this procedure for the right telescopic rail.
Figure 4: Mounting the system brackets
Ê Mount the system brackets on the two telescopic rails.
Ê Pull the mounted telescopic rails out completely. They must click into place
so that you can no longer push them back.
I It takes more than one person to lift the storage subsystem into the rack.