HP (Hewlett-Packard) HP Integrated Lights-Out Network Card User Manual


 
244 User Guide Integrated Lights-Out
14. Click Overview on the left side of the screen after the verification has taken
place. The initial page for devices opens.
Application Launch Using Insight Manager 7
The Application Launch combines the RIBCL, the Lights-Out Configuration
Utility, and the query definition to manage the Group Administration of iLO
management processors.
To create an Application Launch task:
1. Click Device in the navigation bar on the top left side of the screen.
2. Click Tasks to open the Tasks screen.
3. Click New Control Task. A drop-down menu is displayed.
4. Click Application Launch from the dropdown menu to open the Create/Edit
Task screen.
5. Enter the full path and name for the Lights-Out Configuration Utility in the
area provided. If the CPQLOCFG.EXE file is in the root directory of the C:\
drive, then the path is C:\cpqlocfg.exe.
6. Enter the parameters in the area provided. Insight Manager 7 requires the
following parameters for the Lights-Out Configuration Utility:
-F is the full path of the RIBCL file name.
-V is the verbose message (optional).
If the RIBCL file is in the root directory of on the C:\ drive, then the
parameters are:
-F C:\MANAGEUSERS.xml -V
NOTE: The -L parameter cannot designate an output log file. A default
log file named with the DNS name or the IP address is created in the
same directory where CPQLOCFG is launched.
7. Click Next. A screen displays the options for naming the task, defining the
query association, and setting a schedule for the task.
8. Enter a task name in the Enter a name for this task field.
9. Select the query that had been created earlier, for example "Mgmt
Processors."