HP (Hewlett-Packard) RP7400 Server User Manual


 
Review Customer Responsibilities
30
Modems (Consult with the Site Preparation Specialist for Hewlett-Packard requirements.)
Equipment supplied by companies other than HP
Communications equipment at the computer site is not part of the computer and must be considered
separately for power, space, interface cables, and cooling requirements.
Selection of Site Personnel
Depending on the complexity of the computer system, the customer is responsible for selecting a Site
Coordinator, Principal Operator, and a Site Planning Team. Depending on customer requirements, the
Principal Operator may or may not perform all of these tasks. In some installations there may be two or three
people assigned to the various “operator” responsibilities.
Site Coordinator
The Site Coordinator is responsible for the following tasks:
Establishing and maintaining site preparation schedules
Coordinating construction efforts
Primary liaison with Hewlett-Packard representatives
Principal Operator
The Principal Operator is responsible for the following tasks:
System operation
Monitoring site preparation
Ordering computer supplies
Scheduling user training
Maintaining maintenance schedules
Site Planning Team
The Site Planning Team is responsible for the following tasks:
Determining site location and size
Reviewing construction requirements
Reviewing local codes
Reviewing insurance requirements
Scheduling all events related to site completion
Members of the Site Planning Team should include the Site Coordinator, Principal Operator, and the
Hewlett-Packard Site Preparation Specialist. When possible, the electrical contractor, a site construction
coordinator (familiar with local electrical codes), and an air conditioning specialist should be included.