0031-653 0031-659
0031-653 Couldn't route data from STDIN to task
number
Explanation: An error occurred routing STDIN to the indicated task. The partition is
terminated and POE exits.
User Response: Verify that the remote task is active. If the problem persists, gather
information about the problem and follow local site procedures for reporting hardware and
software problems.
0031-654 Allocation error for SSM_read, task
number
, length
number
Explanation: An error occurred allocating storage for a message from a remote node. The
partition is terminated and POE exits. The task id and length requested are printed.
User Response: Verify that sufficient storage is available to run POE on the Home Node,
and that the requested length is not excessive. If the problem persists, gather information
about the problem and follow local site procedures for reporting hardware and software
problems.
0031-655 Can't route message to destination
number
Explanation: An error occurred routing a message to the indicated destination task. The
requested routing is not supported.
User Response: If the message is generated by Parallel Environment, this is an internal
error. If generated by a user program, this is a user error. Determine the source of the
message. If the problem is an internal error, gather information about the problem and follow
local site procedures for reporting hardware and software problems.
0031-656 I/O file
string
closed by task
number
Explanation: The stdio stream indicated has been closed by the indicated task.
User Response: Verify if this is the intended operation. If so, ignore the message. This
message may also occur at the end of a job that terminates normally.
0031-657 Can't send mpl_init_data to nodes
Explanation: An error occurred in broadcasting the CSS initialization data to the remote
nodes. The partition is terminated and POE exits.
User Response: The failing routine is pm_address. Look for other symptoms to determine
the cause of failure.
| 0031-658 Can't send termination signal to nodes.
| Explanation: An error occurred in broadcasting the termination message to the remote
| nodes. The partition is terminated and POE exits (which it was trying to do, anyway).
| User Response: The failing routine is pm_shutdown_job. Look for other symptoms to
| determine the cause of failure.
0031-659 Can't log accounting data from node
number
Explanation: An error occurred in logging the accounting records received from the remote
nodes. Execution continues.
User Response: The failing routine is pm_acct_response. Look for other symptoms to
determine the cause of failure.
92 IBM PE for AIX V2R4.0: Messages