Netopia PN Series Network Router User Manual


 
2-50 Reference Guide
Viewing scheduled connections
To display a table of view-only scheduled connections, select
Display/Change Scheduled Connection in the Scheduled
Connections screen. Each scheduled connection occupies one row of
the table.
Scheduled Connections
+-Days ----Begin At - HH:MM--- When-----Conn. Prof. NameEnabled ------+
| MTWTFSS 08:30PM 06:00 weekly Profile 3 Forced |
| |
| |
+ --------------------------------------------------------------------+
The first column in the table shows a one-letter representation of the
Days of the week, from Monday (M or m) to Sunday (S or s). If a letter
representing a day is capitalized, the connection will be activated on
that day; a lower-case letter means that the connection will not be
activated on that day. If the scheduled connection is configured for a
once-only connection, the word “once” will appear instead of the days
of the week.
The other columns show:
The time of day that the connection will Begin At
The duration of the connection (HH:MM)
Whether it’s a recurring Weekly connection or used Once Only
Which connection profile (Conn. Prof.) is used to connect
Whether the scheduled connection is currently Enabled
You should make sure that the Netopia Router’s system date and time
are correct (see “Setting the system date and time” on page 10-2).
The router checks the date and time set in scheduled connections
against the system date and time.