Powerware 9335 Power Supply User Manual


 
1-4 Powerware 9335 (80 kVA and 120 kVA) Installation and Operation
164201396 REV A 071103
1.
Carefully inspect the outer packaging for evidence of damage during transit.
2.
Use a forklift or other material handling equipment to move the cabinet to a
convenient unpacking area. Insert the forklift forks between the pallet supports on
the bottom of the unit.
3.
Set each cabinet on a firm, level surface, allowing a minimum clearance of 3 m
(10 ft) on each side for removing the cabinets from the pallets.
4
. Remove accessory installation kit located at the top of the unit (see figure 1.1) by
opening top of outer box.
5.
Remove the protective covering from the cabinets.
6.
Remove the packing material, and discard or recycle them in a responsible manner.
7.
After removing the protective covering, inspect the contents for any evidence of
physical damage, and compare each item with the Bill of Lading. If damage has
occurred or shortages are evident, contact the Powerware Customer Service
Department immediately to determine the extent of the damage and its impact upon
further installation.
NOTE:
While awaiting installation, protect the unpacked UPS cabinet from moisture, dust,
and other harmful contaminants. Failure to store and protect the UPS properly may
invalidate the warranty.
CAUTION:
Do not install a damaged cabinet. Report any damage to the carrier and
contact your local sales or service office immediately
.
CAUTION:
Do not tilt cabinets more than
±
10 degrees from vertical.
CAUTION:
If accessory kit is not moved, box will be top heavy upon removal.
Approximate weight of accessory kit is 25 lbs. (11 kg.)