Connecting cables
All cables needed in standard configuration are connected to the Codec. These Codec inputs are marked
green. Connect:
Vision 5000 power cable and monitor power cable to an electrical distribution socket.
Europe: Scart connector to one of the Scart connectors on the monitor, (for a 29 monitor, use Ext-1).
USA: Connect the cable terminating in two RCA connectors and one S-video connector to the monitor. The
two RCA connectors are for the left and right audio channels (not if Natural Audio module is mounted). The
S-video connector is for video. The audio signal from the Vision 5000 is a monaural signal and therefore is
fed into both audio-in sockets on the monitor.
Microphone to the microphone cable.
Connect the camera and the camera cable. The camera cable terminates in a 15 pin D-SUB connector.
ISDN cables - using BRI interface
Take the four ends of the ISDN cables and verify that they are labelled ISDN 1, 2, 3 and 4.
Note
Some software versions of Vision 5000 do not support 4 ISDN lines.
Connect ISDN cable No. 1 to the first ISDN socket (S/T-interface) provided by the service provider. This
will be your main number. Connect ISDN cable No. 2 to the second ISDN socket, ISDN cable No. 3 to
the third ISDN socket and ISDN cable No. 4 to the fourth socket (if used).
USA: The Vision 5000 does not have a built in network terminator. If your wall socket provides you with an
ISDN U-interface, you will need an NT1 between your Vision 5000 and your ISDN line, see Appendix 1.
Note
Write down the numbers associated with each of the ISDN lines. You will need them later to configure the system.
Connecting to the Switched 56 network
When connecting to the Switched 56 network you may use one of the BRI interfaces or the V.35 interface
on the Vision 5000. Please refer to Appendix 2 for further information.
ISDN cable - using the PRI/T1 interface
If you are using the PRI/T1 interface, the PRI/T1 cable should be connected to a CSU (Channel Service Unit).
You will need a CSU between your Vision 5000 and the line from your network provider, see Appendix 3.