3Com DUA1860-0AAA01 Network Hardware User Manual


 
6-8 C
HAPTER
6: P
ROBLEM
S
OLVING
DUA1860-0AAA01
Removing And Replacing Equipment
Inserting additional modules or a second Power Supply Unit into
an active LinkBuilder MSH, known as hot insertion, should not
cause any damage to your equipment. However, the following
points should be noted:
Packets of data passing through the unit at the time of insertion
can be corrupted.
Inserting a second Power Supply Unit can cause a dip in the logic
supply which would reset all modules.
The removal of modules or Power Supply Units that have failed
should not generally interrupt the operation of the LinkBuilder
MSH.
If you hot insert a module or Power Supply Unit into the
LinkBuilder MSH chassis, it may cause problems with the
Management Module or 4 Port Bridge Module. In the unlikely
event of the software becoming corrupted after hot insertion, we
recommend that you press RESET and ENTER on the LinkBuilder
MSH's display panel.