ADCP-96-015 • Issue 1 • July 2004
Page 7
© 2004, ADC Telecommunications, Inc.
Concrete Pad Installations
• Pad Mount Frame kit for ACE-142
• Excavation and earth moving equipment
• Concrete finishing equipment
• Approximately 10 cu. ft. concrete
• Sand or gravel
• Tamping equipment
• 2 x 6 inch framing lumber
• 1 x 4 inch wooden stakes (4)
• Nails and construction screws
• Utility wire (to secure PMF during installation)
•Saw
• Drill with screwdriver bits
• Square
•Level
• Landscaping equipment and site restoration supplies
2.5 Cabinet Mounting
The next two sections provides instructions for mounting the cabinet on either a fiberglass
mounting sleeve or concrete pad. Use whichever procedure is appropriate for the installation.