2-2
Cisco CRS-1 Carrier Routing System 16-Slot Multishelf System Site Planning Guide
OL-7422-04
Chapter 2 16-Slot Fabric Card Chassis Installation Site Requirements
Fabric Card Chassis Unpacking, Moving, and Securing Requirements
Required Tools and Equipment
The following tools and equipment are required to unpack, move, and secure the FCC:
• Crowbar
• Step ladder
• 9/16-in. wrench
• 5/8-in. wrench
• 10-mm wrench
• ESD-immune surface
• ESD-preventative strap (wrist or ankle)
• 14-mm Allen drive socket
• 3/4-in. ratchet socket wrench with a 6.0-in. extension
• 12-mm Allen
• Medium Phillips screwdriver
• Scissors
• Tape measure
• 2.5-mm Allen wrench
• 9/32-in. socket wrench
Fabric Card Chassis Specifications
The following FCC specifications should be noted to plan for unpacking, moving, and securing the
chassis:
Table 2-1 FCC Specifications
Physical dimensions:
Height 80.0 in. (203 cm)
Depth 35.0 in. (88.9 cm)
Width 23.6 in. (59.9 cm)
Weight:
Chassis with only fan trays and
impedance carriers installed
(as shipped)
780 lb (323 kg)
Floor loading:
Chassis footprint
floor contact area
4.720 sq. ft (4385 sq. cm)
680.0 sq. in. (4385 sq. cm)
Maximum floor loading (all
components installed)
1695 lb/4.720 sq. ft = 359.0 lb/sq. ft
769 kg/4385 sq. cm = 0.175 kg/sq. cm