A License Addendum will be provided to allow the customer to install and use the
copy of OS/400 (received with the newly ordered server) on their source model for
up to 70 days. This Addendum authorizes the customers to use the new Version
and Release on the source system for the sole purpose of migrating their data. The
previous Version and Release must be reinstalled after the migration is completed.
The V4R4 or V4R5 licenses of OS/400 and the LPPs will only allow the products to
be run on one system at a time. Model 150 customers who are not at the new
server release of OS/400 must purchase the BasePak Upgrade (5649-EP5 for V4R4)
in addition to any upgrades for installed Optional Products in order to proceed
with their data migration. Feature Code #0205 provides for minimal pre loading of
the new server, inclusion of a special License Addendum, and an insert which
points to the AS/400 Technical Studio Web site (which provides the RISC-to-RISC
Road Map):
http://www.as400.ibm.com/tstudio/tech_ref/rrmap/
This Road Map provides the steps on how to do the RISC-to-RISC data migration.
For subsequent releases of OS/400, the Road Map will be included with the
shipment of the new server. Feature Code #0205 differs from Feature Code #0203.
Feature Code #0203 SHOULD NOT be ordered for AS/400 RISC-to-RISC data
migrations as it is designed exclusively for AS/400 CISC-to-RISC data migrations.
How Long Will the Data Migration Take?
The data migration process includes planning, ordering, shipping, installing and
testing the system. The following table shows approximately how long a data
migration might take.
Note: You should plan at least one additional hour of down time to upgrade the
operating system for source systems not at the new server release level.
Order Planning - 5 to 15 Days Installation Planning and
Preparation - 10 to 30 days
Phase II Installation - Weekend (1 to 3
days)
See “Prerequisite and Related
Information” on page ix for
required publications.
See “Prerequisite and Related
Information” on page ix for
required publications.
Migrate Data
System Requirements Solution Assurance Verify System
Performance Physical Planning (Site
Preparation)
Check History and Clean Up Messages
Determine Services Needed Software Preparation (Upgrade
Source System Software)
Save System
Place Order Save System
Books to Use for Software Release Upgrades
The following table lists software release considerations, and which book to use for
upgrading the operating system and licensed programs.
4 AS400e 940x RISC-to-RISC Road Map V4R5