IBM As400e 940 Server User Manual


 
d. Click Saving your system with the GO SAVE command
e. Click Saving your whole system with GO SAVE: Option 21
Note: Make sure that the system is saved on a tape unit that is compatible
with the tape unit used for an alternate IPL device on the target
system.
__ 14. Delete any unused device configuration descriptions.
Table 5. Clear non-reporting resources on each LPAR Partition.
No LPAR LPAR Primary LPAR Secondary
This is recommended for
good system performance
but, no action required, skip
to the next numbered task.
Use the Hardware Service
Manager service option to
remove non-reporting
resources that no longer are
associated with existing
hardware.
Use the Hardware Service
Manager service option to
remove non-reporting
resources that no longer are
associated with existing
hardware.
Attention: Ensure all I/O
resources are assigned to a
partition.
Use the same procedure as
described for the LPAR
Primary for each Secondary
Partition that is configured.
__ 15. Save the entire system on each partition. Use option 21 on the Save menu.
For more information about saving the entire system using option 21, refer
to any of the following:
v The chapter on saving your AS/400 system in the book Backup and
Recovery, SC41-5304-04
v The Backup, Recovery, and Availability topic under System
Administration, Availability, and Maintenance in the Information
Center:
http://www.as400.ibm.com/infocenter
To find the procedure for saving the entire system (using option 21) in
the Information Center, do the following:
a. Click System Administration, Availability, and Maintenance
b. Click Backup, Recovery, and Availability
c. Click Backing up your system
d. Click Saving your system with the GO SAVE command
e. Click Saving your whole system with GO SAVE: Option 21
Note: Make sure that you save the system and data on a tape unit that is
compatible with the tape unit on the target system.
__ 16. Resume normal system operations and processing.
__ 17. To verify that all your applications are running properly, use the system
with the new software release for 2 or more weeks before installing the
hardware.
Before the hardware upgrade is to take place, the customer should do the
following:
__ 1. Ensure that the currently installed machine and LPAR partitions are
documented.
No LPAR or LPAR Primary Partition Secondary LPAR Partitions
Chapter 3. Procedure for an Upgrade (RISC-to-RISC) 23