Chapter 4 Operation
The SDP-Eco 1630 III is a SCSI device. Turn ON the power switch for this
machine first, and complete its initialization routine. Then turn ON the
power switch to the host computer (RIP computer).
Be sure to turn OFF the power switch to the host computer (RIP computer)
when turning OFF the power switch for this machine.
Never open the front door or plate setting cover unnecessarily. Do
not open the plate setting cover except when replacing the plate roll.
Otherwise, the plate being processed may be adversely exposed. If
the front door is opened while the plate is being fed, it will adversely
affect the plate's image quality and feed state.
4.1 Cable connection check
After checking that the entire system including the host computer (RIP
computer) is shut down, check that all cables are connected correctly. The
figure below shows cable connections and locations. The cables used here
should be SCSI connection dedicated cables.
Do not use cables other than
the provided SCSI cables.
If the cable must be extended,
please purchase the optional
differential unit. This ma-
chine is incorporated with an
active terminator, so that this
differential unit can be
mounted internally.
Chapter 4 Operation
- 25 -
Caution
Wide SCSI
connector
Do not open the cover
during operation
Do not open the door
during operation