American Power Conversion 400V Power Supply User Manual


 
50 Smart Distribution Panel with ATS
Configuring the InfraStruXure Manager
Connect the ATS to the InfraStruXure Manager
1. Connect a Cat-5 network cable to the surge-protected ethernet port on the ATS user connection
plate. The arrow in the illustration below is pointing to the port. The figure on page 11 shows
the location of the user connection plate on the roof of the ATS.
You can make connections from inside the enclosure, or
you can remove the user connection plate and make your
connections. Remove the plate using a Phillips or standard
screwdriver to loosen the two captive screws. Use the
knockout in the plate to route cables to and from the user
connections on the plate. If you remove the plate, make
sure that you do not disturb the existing connections.
2. Run the connected Cat-5 network cable through a knockout
in the user connection plate to the InfraStruXure Manager Hub.
3. Configure the InfraStruXure Manager once all APC InfraStruXure-Certified equipment is
installed, the network cables are connected to the InfraStruXure Manager Hub, and start-up of
the system is complete.
See also
For detailed configuration instructions, see the InfraStruXure Manager Installation and
Quick-Start manual included with your InfraStruXure Manager.