Overview
Smart Distribution Panel with ATS 13
ATS panel board, left side
The handle aids the optional removal of the
panel board from the ATS enclosure. Use at
least two people to remove the panel board
from the ATS enclosure. See the
InfraStruXure Power Generation System
Installation Manual for instructions.
Control power from Source 1 is supplied
through the Source 1 fuse block to the Source
1 control transformer for powering the Source
1 motorized switch and the ATS monitoring
unit.
The Source 1 control transformer outputs
AC power to the Source 1 motorized switch,
and the ATS monitoring unit. The transformer
steps down 400V input.
The communication converter allows the
generator and ATS to communicate.
The ATS has several monitoring boards that
report to a central board assembly located in
the ATS monitoring unit. See “ATS
monitoring unit” on page 17 for detailed
information.
Behind this access panel is the ATS interface
circuit board. Use a Phillips or standard
screwdriver to remove the panel.
Input conductors from the generator connect
to the Source 2 input switch. See the
InfraStruXure Power Generation System
Electrical Installation Manual for connection
instructions.
WARNING: Only a certified electrician should connect the generator to the ATS!
The wheel assembly on the panel board allows for easy removal of the panel board during
unpacking.