American Power Conversion AP9207 Power Supply User Manual


 
28
Configuring Share-UPS
continued
Testing
Share-UPS
To test the operation of Share-UPS, perform the following
steps in the order given. If Share-UPS fails this test, see
“Troubleshooting: Table 12” on page 48.
1 Confirm that the UPS in on and that the battery is
fully charged.
2 Verify that Share-UPS has been installed, con-
nected, and configured.
3 Start the power management software on the serv-
ers, with power management screens visible, if
applicable.
4 Confirm that the Power and Status LEDs on
Share-UPS are on, indicating normal operation.
5 Simulate a utility power failure.
6 Confirm that the On Batt LED of Share-UPS is on,
indicating that Share-UPS is sending an On Bat-
tery signal to the connected servers or devices. See
“LEDs: Table 2” on page 8.
7 Confirm that all connected servers and devices
have received the On Battery message from Share-
UPS.
8 Restore utility power.
9 Confirm that all connected servers and devices
have received the message that utility power has
been restored.
Note
: To check the shutdown mode of your config-
uration, keep the utility power off long
enough to allow all connected servers and
devices to shut down. After all connected
servers and devices have shut down, restore
power and verify that they all restart.